Saraya aqaba resort construction of pumping station 2016

Location: AQABA, JORDAN
Client: Eagle Hills
Main Contractor: Jv- consolidated contractors group s.a.l (offshore)/ arabtec construction l.l.c/drake and skull construction co. l.l.c- drake and skull engineering co.l.l.c
Consultant:

Consolidated consultants- turner international middle east ltd

Date: 2017-07-04
  • Sea outfall pipeline of total length 700 linear meter starting from -4m to -13m
  • Offshore dredging of pipeline channel in hard rock near shore & sand material at deeper sections
  • Installation of ballast layer
  • Casting and installation of precast concrete weight blocks with protective epdm rubber layer
  • Installation of grp pipes & diffuser
  • Backfilling with approved anti scouring material and reinstatement of existing sea bed

Sewage treatment Plant Construction- Offshore Package