Doraleh oil terminal rehabilitation of piers & dolphins 2012 – 2013

Location: DJIBOUTI, DJIBOUTI
Client: DP WORLD
Main Contractor: HOMAN GROUP
Consultant:

TECHNITAL

Date: 2017-07-04
  • Sea outfall pipeline of total length 700 linear meter starting from -4m to -13m
  • Offshore dredging of pipeline channel in hard rock near shore & sand material at deeper sections
  • Installation of ballast layer
  • Casting and installation of precast concrete weight blocks with protective epdm rubber layer
  • Installation of grp pipes & diffuser
  • Backfilling with approved anti scouring material and reinstatement of existing sea bed

Sewage treatment Plant Construction- Offshore Package

Share: