Location /CHEKKA , LEBANON
Client /CIMENTERIE NATIONAL S.A.L
Main Contractor /MAR Group
Consultant /LIBAN CONSULT S.A.R.L
Description
<<Cooling Plant For Power Generators – Design Build Package For The Cooling Plant Intake Pipeline, Channel And Pumping Station Basin>>
Project Specifics
Sea water intake pipeline of 1200mm diameter
Offshore dredging of intake pipeline channel in hard rock
Installation of ballast layer
Casting and installation of precast concrete weight blocks with protective epdm rubber layer
Installation of 1200mm grp pipe
Backfilling with approved anti scouring material and reinstatement of existing sea bed
Supply and installation of aspiration chamber
Excavation and construction of 5000 m3 water basin in hard rock
Construction of cylindrical concrete walls, sand traps and covers