SARAYA AQABA RESORT CONSTRUCTION OF PUMPING STATION 2016

Location /AQABA, JORDAN
Client /Eagle Hills
Main Contractor /JV- CONSOLIDATED CONTRACTORS GROUP S.A.L (OFFSHORE)/ ARABTEC CONSTRUCTION L.L.C/DRAKE AND SKULL CONSTRUCTION CO. L.L.C- DRAKE AND SKULL ENGINEERING CO.L.L.C
Consultant /CONSOLIDATED CONSULTANTS- TURNER INTERNATIONAL MIDDLE EAST Ltd
Description
<<Saraya Aqaba Hotels And Resorts – Design Build Package For The District Cooling Plant Pump House>>

Project Specifics

    Design and installation of temporary shoring using soldier piling system supported with 3 layers structure steel bracing system to allow excavation to bottom of foundation level at -7.5m at a sensitive area and casting of reinfocre concrete pumping station surrounded by adjacent hotel from one side and the royal palace from the other side
    Dewatering system using deep wells, bottom layer of well point system in addition to a trenching system system was selected carefully to avoid and settlement in surrounding structures
    Foundations and walls thickness were carefully designed to withstand the uplift forces and minimum crack theory
    Waterproofing system was selected and applied on the outer walls sides and internal side
    Roofing system was made of precast pre-stressed beams and slabs
    MEP and finishing works
    Location of the structure and accessibility was challenging and pump house civil works including shoring and excavations were successfully completed in 75 days