KFOURY METALS COMMERCIAL PORT 2009-2010

Location /SELAATA, LEBANON
Client /KFOURY METALS
Main Contractor /MAR GROUP
Consultant /SEATEC S.A.R.L
Description
<<Kfoury Metals New Steel Mill Factory Construction Of Loading Quays For Ships>>

Project Specifics

    Construction of 5000 m2 loading /offloading quay
    Quay walls consisting of underwater cast in situ concrete blocks around the perimeter at water depth ranging from level -7m to -15m
    Reclamation within the quay walls of around 55000m3
    Dredging of around 30000 m3 of hard rock to required foundation depth
    Installation of underwater ballast layer.
    Revetment consisting of rock layers placing
    Reinforced concrete capping beam including all ancillaries, mep, Fenders & bollards
    Dredging in hard rock for surrounding berthing area
    Floating pontoons and guide piles
    Intake pipeline facility for power generators cooling system

Date:

July 3, 2017

Category:

Marine Works Selective