DORALEH CONTAINER TERMINAL REHABILITATION OF QUAY 2014

Location /DJIBOUTI, DJIBOUTI
Client /DP WORLD
Main Contractor /HOMAN GROUP
Consultant /EGIS
Description
<<DORALEH CONTAINER TERMINAL- REHABILITATION AND MAINTENANCE>>

Project Specifics

    Repairs of reinforced concrete surfaces
    Repairs of severly damaged edges of transverse beams (concrete spalling)
    Epoxy coating protection of 12400m2 exposed concrete surfaces.
    Repair of 1600m2 damaged concrete on top part of quay walls capping beam
    Repairs & epoxy coating of splash areas steel piles using blast cleaning, as per grade sa 2.5, preparation of steel substrates before application of paint and application of two-pack highly pigmented fast curing zinc-rich epoxy resin Based for steel
    Application of shock/chemical resistant coat consisting of two-pack epoxy picaceous iron oxide coating
    Application of corrosion polyurethane based outer coat

Date:

July 4, 2017

Category:

Civil Works