BATROUN FISHING HARBOR 2009-2012

Location /Batroun , LEBANON
Client /MINISTRY OF PUBLIC WORK & TRANSPORT- DIRECTORATE GENERAL OF LAND &MARITIME TRANSPORT
Main Contractor /SOUTH FOR COSTRUCTION
Consultant /LIBAN CONSULT S.A.R.L
Description
<<Batroun Fishing Port – Execution Of Breakwaters, Quays And Dredging Of Marina>>

Project Specifics

    Breakwater of 110m length at 13m water depth connected to existing phoenician old historical wall
    Rock layers protection placing
    Casting & installation Concrete armour (acropode I-16m3)
    Dredging for breakwater foundation and toes
    Construction of crown walls
    Sea protection revetement 600m length consisting of rocks layers and (acropode I-16m3) at -8m
    Quay walls of 670 linear meters length consisting of cast in situ blocks underwater Concrete blocks around the port perimeter at level -5m including utility channels for mep and reinforced concrete capping & slab on grade
    Construction of 1 no. slipways.
    Dredging for quay wall foundations and breakwater toe
    Dredging in hard rock for marina basin (80000 m3 )
    Construction of 2x light houses

Category:

Marine Works Selective